|
Quick to install
A three man gang can normally lay up to 200m2
of floor in a day
Safe Working Platform
No need to wait for concrete slabs to cure or for timber
to be laid. Grouted floor forms an immediate base for
subsequent building operations.
Simple all Weather Construction
There is no need to worry about frost damage to concrete
slabs or water logged sites.
Eliminates Backfill
Expensive backfill and compaction are not required.
Ground heave problems are avoided.
|
Draught,Rot Proof and Fire Resistant
The durability of solid concrete and more simple to
lay than timber.
Good Thermal Insulation
The thermal insultion required by the Building Regultions
is easily achieved by a dry construction.
Low Cost
The most cost effective all weather flooring system.
page 2>
|